Pressure Equipment Regulations, 2009
149 rows
Not verified⚑ 0 flags open
| Flag | Citation | Number | Subs | Para | Subpara | Item | Role | Text |
|---|---|---|---|---|---|---|---|---|
| Pressure Equipment Regulations 1 | 1 | opening | In these Regulations any word or expression to which a meaning has been assigned in the Act shall have the meaning so assigned and, unless the context otherwise indicates ─ | |||||
| Pressure Equipment Regulations 2(1) | 2 | (1) | entry | These Regulations shall apply to the design, manufacture, operation, repair, modification, maintenance, inspection and testing of pressure equipment with a design pressure equal to or greater than 50 kPa, in terms of the relevant health and safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 2(2) | 2 | (2) | entry | Regulations 3, 4, 5, 9 (1), 9 (2) and 9 (3) shall not apply to pressure equipment in use or on order prior to the publication of these Regulations, which equipment shall be designed and constructed according to the requirements applicable at the time of order. | ||||
| Pressure Equipment Regulations 2(3) | 2 | (3) | opening | The following pressure equipment shall be excluded from these Regulations— | ||||
| Pressure Equipment Regulations 2(3)(a) | 2 | (3) | (a) | entry | Piping for the supply, distribution and discharge of water below its boiling point at atmospheric pressure and associated pressure equipment and headraces such as penstocks, pressure tunnels, pressure shafts for hydro-electric installations and their related specific pressure accessories; | |||
| Pressure Equipment Regulations 2(3)(b) | 2 | (3) | (b) | entry | aerosol dispensers; | |||
| Pressure Equipment Regulations 2(3)(c) | 2 | (3) | (c) | entry | pressure equipment intended for the functioning of road and rail vehicles, excluding a fuel gas system; | |||
| Pressure Equipment Regulations 2(3)(d) | 2 | (3) | (d) | opening | pressure equipment comprising casings or machinery where the dimensioning, choice of material and manufacturing rules are based primarily on requirements for sufficient strength, rigidity and stability to meet the static and dynamic operational effects or other operational characteristics and for which pressure is not a significant design factor, and such pressure equipment may include— | |||
| Pressure Equipment Regulations 2(3)(d)(i) | 2 | (3) | (d) | (i) | entry | engines, including turbines and internal combustion engines; | ||
| Pressure Equipment Regulations 2(3)(d)(ii) | 2 | (3) | (d) | (ii) | entry | reciprocating steam engines, gas turbines, steam turbines, turbo-generators, compressor engines, pumps and actuating devices; | ||
| Pressure Equipment Regulations 2(3)(e) | 2 | (3) | (e) | entry | open metal-making pots and blast furnaces | |||
| Pressure Equipment Regulations 2(3)(f) | 2 | (3) | (f) | entry | housing for electrical machinery such as switchgear, control gear, transformers and rotating machines; | |||
| Pressure Equipment Regulations 2(3)(g) | 2 | (3) | (g) | entry | tyres and flexible pressurised casings used for recreational purposes; | |||
| Pressure Equipment Regulations 2(3)(h) | 2 | (3) | (h) | entry | fixed electrical hot-water storage container of water capacity from 15 litres to 450 litres operating at a maximum pressure of 600 kPa manufactured to the requirements of SANS 151, which shall be installed in accordance with the requirements of SANS 10254. | |||
| Pressure Equipment Regulations 3(1) | 3 | (1) | entry | Any person who manufactures, imports, sells, offers or supplies any pressure equipment described in these Regulations for use in the Republic shall ensure that such equipment complies with these Regulations. | ||||
| Pressure Equipment Regulations 3(2) | 3 | (2) | entry | Any person who erects or installs any pressure equipment for use in the Republic shall ensure, as far as is reasonably practicable, that it is erected or installed in a safe manner and without risk to health and safety when properly used. | ||||
| Pressure Equipment Regulations 3(3) | 3 | (3) | entry | All pressure equipment for use in the Republic shall be categorized and submitted to the applicable conformance assessments of SANS 347 in addition to the requirements of the relevant health and safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 4(1) | 4 | (1) | entry | The manufacturer shall have an obligation to ensure that all equipment designed and manufactured for use in the Republic shall be conformity assessed and subjected to the requirements set out in SANS 347. | ||||
| Pressure Equipment Regulations 4(2) | 4 | (2) | entry | Subject to the requirements set out in the relevant health and safety standard incorporated into these Regulations under section 44 of the Act, the manufacturer shall ensure that the pressure equipment as manufactured, modified, inspected, tested or repaired is safe and without risks to health when properly used. | ||||
| Pressure Equipment Regulations 4(3) | 4 | (3) | entry | Subject to the requirements of this regulation a manufacturer shall issue a certificate of manufacture for all pressure equipment supplied, with a verification signature by an approved inspection authority when so required. | ||||
| Pressure Equipment Regulations 4(4) | 4 | (4) | entry | Subject to the requirements of this regulation a manufacturer shall comply with any other duty assigned to the manufacturer in these Regulations. | ||||
| Pressure Equipment Regulations 4(5) | 4 | (5) | entry | A manufacturer who determines that pressure equipment in use has a latent defect shall advise the chief inspector in writing forthwith thereof and of measures being taken to correct the defect. | ||||
| Pressure Equipment Regulations 5(1) | 5 | (1) | entry | Importers and suppliers shall ensure that pressure equipment sold complies with the requirements of these Regulations. | ||||
| Pressure Equipment Regulations 5(2) | 5 | (2) | entry | The importer shall assume the liability of the manufacturer in terms of these Regulations. | ||||
| Pressure Equipment Regulations 5(3) | 5 | (3) | entry | Any pressure equipment that requires a permit to be issued by an organisation approved by the chief inspector shall ensure that such approval is obtained by the importer or manufacturer before the pressure equipment is placed in the market: | ||||
| Pressure Equipment Regulations 5(3) | 5 | (3) | proviso | Provided that such equipment shall comply with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 6(1) | 6 | (1) | entry | The user shall ensure that the pressure equipment is operated and maintained within its design and operating parameters. | ||||
| Pressure Equipment Regulations 6(2) | 6 | (2) | opening | The user shall, subject to the relevant health and safety standard incorporated into these Regulations under section 44 of the Act— | ||||
| Pressure Equipment Regulations 6(2)(a) | 6 | (2) | (a) | entry | provide the manufacturer, repairer or modifier with comprehensive information of the operating or intended operating conditions of the pressure equipment, including the characteristics of the fluid and operating parameters of other connected pressure equipment, where reasonably practicable; | |||
| Pressure Equipment Regulations 6(2)(b) | 6 | (2) | (b) | entry | ensure pressure equipment has a certificate, issued by the manufacturer, including a verification signature by an approved inspection authority when required, which certifies that the pressure equipment has been designed and manufactured in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act; | |||
| Pressure Equipment Regulations 6(2)(c) | 6 | (2) | (c) | entry | ensure pressure equipment has a certificate issued by the repairer or modifier, including a verification signature by an approved inspection authority when required, which certifies that the pressure equipment has been modified or repaired in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act; | |||
| Pressure Equipment Regulations 6(2)(d) | 6 | (2) | (d) | entry | ensure that pressure equipment has a certificate issued by an approved inspection authority before commissioning, where applicable; and | |||
| Pressure Equipment Regulations 6(2)(e) | 6 | (2) | (e) | entry | ensure that a gas system has a valid certificate issued by an authorised person. | |||
| Pressure Equipment Regulations 7(1) | 7 | (1) | entry | Only an organisation holding an approval certificate from the chief inspector shall perform the duties of an approved inspection authority within the scope of accreditation. | ||||
| Pressure Equipment Regulations 7(2) | 7 | (2) | entry | An application for approval in terms of subregulation (1) shall include the applicant’s proof of accreditation prescribed by paragraph (a) or (b) of subregulation (3), including full contact details and address. | ||||
| Pressure Equipment Regulations 7(3) | 7 | (3) | opening | The chief inspector’s approval— | ||||
| Pressure Equipment Regulations 7(3)(a) | 7 | (3) | (a) | entry | of inspection bodies operating in the Republic shall be subject to the submission of an accreditation certificate issued by the accreditation authority in accordance with the requirements of SANS/ISO 17020 and SANS 10227: | |||
| Pressure Equipment Regulations 7(3)(a) | 7 | (3) | (a) | proviso | Provided that the chief inspector may set additional requirements before granting approval; or | |||
| Pressure Equipment Regulations 7(3)(b) | 7 | (3) | (b) | opening | of foreign inspection bodies shall be subject to the submission of an accreditation certificate issued by an International Laboratory Accreditation Cooperation (ILAC) or an International Accreditation Forum (IAF), Mutual Recognition Arrangement signatory in accordance with the requirements of ISO/ IEC 17020: | |||
| Pressure Equipment Regulations 7(3)(b) | 7 | (3) | (b) | proviso | Provided that— | |||
| Pressure Equipment Regulations 7(3)(b)(i) | 7 | (3) | (b) | (i) | entry | the foreign inspection body shall ensure compliance with all the duties assigned to an approved domestic inspection authority in terms of these Regulations and within their scope of accreditation together with the applicable health and safety standards; and | ||
| Pressure Equipment Regulations 7(3)(b)(ii) | 7 | (3) | (b) | (ii) | entry | the chief inspector may set additional requirements before granting approval. | ||
| Pressure Equipment Regulations 7(4) | 7 | (4) | entry | Imported pressure equipment stamped by an ASME authorised manufacturer in compliance with the full ASME Code of Construction shall be deemed to meet the requirements of these Regulations. | ||||
| Pressure Equipment Regulations 7(5) | 7 | (5) | entry | In the event of a dispute of a technical or safety issue, which could not be reasonably resolved between an approved inspection authority and any interested party, including the user, modifier, repairer or manufacturer, an interested party may refer the case to the chief inspector in writing for arbitration, setting out the full details of the dispute. | ||||
| Pressure Equipment Regulations 7(6) | 7 | (6) | entry | Upon receiving such a dispute in terms of subregulation (5), the chief inspector may appoint an arbitrator mutually agreed upon between the parties. | ||||
| Pressure Equipment Regulations 7(7) | 7 | (7) | entry | A case referred to the chief inspector in terms of subregulation (5) shall be investigated and arbitrated within a maximum of 90 days. | ||||
| Pressure Equipment Regulations 7(8) | 7 | (8) | entry | An approved inspection authority shall ensure compliance with all the duties assigned to an approved inspection authority in these Regulations within its scope of accreditation and the relevant health and safety standard. | ||||
| Pressure Equipment Regulations 8(1) | 8 | (1) | entry | No user may use a steam generator unless such user is in possession of a certificate of registration issued in terms of subregulation (3) for that steam generator. | ||||
| Pressure Equipment Regulations 8(2) | 8 | (2) | entry | Application for registration to use a steam generator shall be made prior to use to the provincial director in the form of Annexure 2, including copies of a certificate from the manufacturer and from the approved inspection authority after installation prior to commissioning: | ||||
| Pressure Equipment Regulations 8(2) | 8 | (2) | proviso | Provided that this subregulation shall not apply in respect of the re-erection of a steam generator on the same premises. | ||||
| Pressure Equipment Regulations 8(3) | 8 | (3) | entry | On receipt of an application for registration in terms of subregulation (1), the provincial director shall forward that application to an inspector who may issue a certificate of registration in the form of Part C of Annexure 2 in respect of that steam generator, subject to the conditions that may be specified on the certificate. | ||||
| Pressure Equipment Regulations 8(4) | 8 | (4) | entry | Any user of a steam generator for which a certificate of registration has been issued shall cause the certificate of registration to be made available on request to an inspector or an approved inspection authority. | ||||
| Pressure Equipment Regulations 8(5) | 8 | (5) | entry | A user shall, within seven days after discovering that the certificate of registration has been lost, defaced or destroyed, apply to the provincial director in the form of Part A of Annexure 2 for the issue of a duplicate certificate, and affix the fee of R100,00 in the form of uncancelled revenue stamps to such an application. | ||||
| Pressure Equipment Regulations 8(6) | 8 | (6) | entry | On receipt of an application in terms of subregulation (5), the provincial director shall issue the duplicate certificate if he or she is satisfied that the original certificate has been lost, defaced or destroyed. | ||||
| Pressure Equipment Regulations 8(7) | 8 | (7) | opening | A user of a steam generator shall immediately notify the provincial director in writing when— | ||||
| Pressure Equipment Regulations 8(7)(a) | 8 | (7) | (a) | entry | such steam generator is no longer in use; | |||
| Pressure Equipment Regulations 8(7)(b) | 8 | (7) | (b) | entry | the right of control over the use of the steam generator is transferred by the user to any other user; or | |||
| Pressure Equipment Regulations 8(7)(c) | 8 | (7) | (c) | entry | the user moves the steam generator to premises other than the premises reflected on its certificate of registration. | |||
| Pressure Equipment Regulations 8(8) | 8 | (8) | opening | A certificate of registration issued in terms of subregulation (3) shall lapse— | ||||
| Pressure Equipment Regulations 8(8)(a) | 8 | (8) | (a) | entry | upon the transfer of the right of control over the use of the steam generator to another user; or | |||
| Pressure Equipment Regulations 8(8)(b) | 8 | (8) | (b) | entry | when a steam generator is removed from the premises reflected on its certificate of registration. | |||
| Pressure Equipment Regulations 9(1) | 9 | (1) | entry | Every manufacturer of pressure equipment shall cause the pressure equipment to be marked in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 9(2) | 9 | (2) | opening | Every manufacturer shall cause a data plate to be permanently fixed in a conspicuous place to any steam generator or pressure vessel with the following minimum particulars: | ||||
| Pressure Equipment Regulations 9(2)(a) | 9 | (2) | (a) | entry | name of manufacturer; | |||
| Pressure Equipment Regulations 9(2)(b) | 9 | (2) | (b) | entry | country of origin; | |||
| Pressure Equipment Regulations 9(2)(c) | 9 | (2) | (c) | entry | year of manufacture; | |||
| Pressure Equipment Regulations 9(2)(d) | 9 | (2) | (d) | entry | manufacturer’s serial number; | |||
| Pressure Equipment Regulations 9(2)(e) | 9 | (2) | (e) | entry | reference number, date and edition of the health and safety standard; | |||
| Pressure Equipment Regulations 9(2)(f) | 9 | (2) | (f) | entry | design pressure in units of Pascal; | |||
| Pressure Equipment Regulations 9(2)(g) | 9 | (2) | (g) | entry | design temperature for both minimum and maximum in degrees Celsius; | |||
| Pressure Equipment Regulations 9(2)(h) | 9 | (2) | (h) | entry | capacity in cubic metres; | |||
| Pressure Equipment Regulations 9(2)(i) | 9 | (2) | (i) | entry | unique mark of an approved inspection authority as applicable; and | |||
| Pressure Equipment Regulations 9(2)(j) | 9 | (2) | (j) | entry | the hazard category in accordance with the requirements of SANS 347. | |||
| Pressure Equipment Regulations 9(3) | 9 | (3) | opening | In the case of composite pressure equipment the following information shall be included in addition to that referred to in subregulation (2): | ||||
| Pressure Equipment Regulations 9(3)(a) | 9 | (3) | (a) | entry | the resin system of the corrosion barrier/lining; | |||
| Pressure Equipment Regulations 9(3)(b) | 9 | (3) | (b) | entry | the resin system of the structural wall; and | |||
| Pressure Equipment Regulations 9(3)(c) | 9 | (3) | (c) | entry | the name and specific gravity of the medium for which the vessel was designed. | |||
| Pressure Equipment Regulations 9(4) | 9 | (4) | entry | No person may remove a marking or data plate referred to in this regulation or wilfully damage or alter the particulars marked thereon, except as provided in this regulation. | ||||
| Pressure Equipment Regulations 9(5) | 9 | (5) | entry | A user shall ensure that any modification that changes the original design conditions is identified by affixing an additional data plate. | ||||
| Pressure Equipment Regulations 9(6) | 9 | (6) | entry | A user shall ensure that a data plate is affixed to any steam generator or pressure vessel that has been re-certified: | ||||
| Pressure Equipment Regulations 9(6) | 9 | (6) | proviso | Provided that where the manufacturer is unknown, the user responsible for the re-certification shall be deemed to be the manufacturer. | ||||
| Pressure Equipment Regulations 10(1) | 10 | (1) | entry | No user may require or permit pressure equipment to be used unless it is provided with all the pressure and safety accessories required by the relevant health and safety standard which is incorporated into these Regulations under section 44 of the Act and used in the design, construction and manufacture of such pressure equipment: | ||||
| Pressure Equipment Regulations 10(1) | 10 | (1) | proviso | Provided that alternative safety accessories other than those required by the standard may be fitted with the written approval of an approved inspection authority. | ||||
| Pressure Equipment Regulations 10(2) | 10 | (2) | entry | In the absence of a requirement referred to in subregulation (1) in the relevant health and safety standard which is incorporated into these Regulations under section 44 of the Act and used in the design, construction and manufacture of such pressure equipment, safety accessories shall be provided by the user as required by the approved inspection authority and those safety accessories shall be so selected, arranged and installed as to be safe for the particular purpose for which the pressure equipment is to be used. | ||||
| Pressure Equipment Regulations 10(3) | 10 | (3) | entry | Every user of a steam generator or pressure vessel shall ensure that the steam generator or pressure vessel in use is fitted with at least one pressure measuring device. | ||||
| Pressure Equipment Regulations 10(4) | 10 | (4) | entry | Every user of a steam generator or pressure vessel shall ensure that the steam generator or pressure vessel in use is fitted with at least one safety valve and that safety valve is kept locked, sealed or otherwise rendered inaccessible to any unauthorised person. | ||||
| Pressure Equipment Regulations 10(5) | 10 | (5) | entry | The number and capacity of the safety valve referred to in subregulation (4) shall comply with the requirements of the design standard for the steam generator or pressure vessel or as required in terms of subregulation (2). | ||||
| Pressure Equipment Regulations 10(6) | 10 | (6) | entry | Every user shall ensure that the automatic controls and indicators of a steam generator, pressure vessel or piping are arranged, installed, maintained and operated in accordance with the relevant health and safety standard which is incorporated into these Regulations under section 44 of the Act and used in the design and manufacture of the steam generator, pressure vessel or pressurized system: | ||||
| Pressure Equipment Regulations 10(6) | 10 | (6) | proviso | Provided that in the absence of such provisions, where automatic controls and indicators are installed, they shall be selected, arranged and installed subject to the written approval of an approved inspection authority. | ||||
| Pressure Equipment Regulations 11(1) | 11 | (1) | opening | Subject to the requirements of the relevant health and safety standard incorporated into these Regulations under section 44 of the Act, the user shall cause— | ||||
| Pressure Equipment Regulations 11(1)(a) | 11 | (1) | (a) | entry | steam generators or pressure vessels, including pressure and safety accessories, after they are installed or re-installed and before they are commissioned, to be subjected to a witnessed internal and external inspection of a hydraulic pressure test to 1,25 times the design pressure by an approved inspection authority: | |||
| Pressure Equipment Regulations 11(1)(a) | 11 | (1) | (a) | proviso | Provided that Category I equipment as categorised in terms of SANS 347 may be inspected, tested and witnessed by the user: | |||
| Pressure Equipment Regulations 11(1)(a) | 11 | (1) | (a) | proviso | Provided further that the user may, subject to the written approval of an approved inspection authority, dispense with the internal inspection and hydraulic pressure test where it could have an adverse effect on the operation or integrity of the pressure equipment; | |||
| Pressure Equipment Regulations 11(1)(b) | 11 | (1) | (b) | entry | piping to be inspected and tested by the manufacturer after manufacture, installation, modification or repair and before commissioning in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act, and, where applicable, to be witnessed by an approved inspection authority: | |||
| Pressure Equipment Regulations 11(1)(b) | 11 | (1) | (b) | proviso | Provided that Category I equipment as categorised in terms of SANS 347 may be inspected, tested and witnessed by the user; | |||
| Pressure Equipment Regulations 11(1)(c) | 11 | (1) | (c) | entry | every fire-tube steam generator to be subjected to an external inspection every 12 months and a witnessed hydraulic test and crack detection of critical welds every 36 months, by an approved inspection authority for in-service inspection appointed by the user in writing; | |||
| Pressure Equipment Regulations 11(1)(d) | 11 | (1) | (d) | entry | every pressure vessel and steam generator, excluding those referred to in subregulation (3), to be subjected to an internal and external inspection and a hydraulic test to a pressure of 1,25 times the design pressure by an approved inspection authority for in-service inspection appointed by the user in writing, at intervals not exceeding 36 months: | |||
| Pressure Equipment Regulations 11(1)(d) | 11 | (1) | (d) | proviso | Provided that Category I equipment as categorised in terms of SANS 347 may be inspected and tested by the user: | |||
| Pressure Equipment Regulations 11(1)(d) | 11 | (1) | (d) | proviso | Provided further that where the pressure equipment is not subject to deterioration processes, the user may dispense with the internal inspection and hydraulic pressure test, subject to a maximum period of nine years for that pressure vessel or steam generator and written approval by an approved inspection authority: | |||
| Pressure Equipment Regulations 11(1)(d) | 11 | (1) | (d) | proviso | Provided further that the chief inspector may require a specific steam generator or pressure vessel to be inspected or tested more frequently; and | |||
| Pressure Equipment Regulations 11(1)(e) | 11 | (1) | (e) | entry | all piping and pipelines to be inspected and tested in accordance with the relevant in-service health and safety standard: | |||
| Pressure Equipment Regulations 11(1)(e) | 11 | (1) | (e) | proviso | Provided that where the health and safety standard does not prescribe in-service inspections and test intervals, such intervals shall be determined by a risk-based inspection applying sound engineering practice: | |||
| Pressure Equipment Regulations 11(1)(e) | 11 | (1) | (e) | proviso | Provided further that such inspection and test for Category II equipment and higher as categorized in terms of SANS 347 shall be performed by a competent person referred to in regulation 1 of the General Machinery Regulations, 1988. | |||
| Pressure Equipment Regulations 11(2) | 11 | (2) | entry | Where it is impracticable to use a liquid for the hydraulic pressure test referred to in subregulation (1) (d) or (e), the test may, subject to the prior written approval of an approved inspection authority, be carried out with an inert gas to a pressure of 1,1 times the design pressure: | ||||
| Pressure Equipment Regulations 11(2) | 11 | (2) | proviso | Provided that, where reasonably practicable, the test shall be preceded by an internal inspection and any conditions and precautionary measures determined by the user and approved by the approved inspection authority. | ||||
| Pressure Equipment Regulations 11(3) | 11 | (3) | entry | Where an inspection or test carried out in terms of subregulation (1) (c), (d) and (e) reveals any weakness or defect whereby the safety of persons may be endangered, the weakness or defect shall be reported forthwith to the user by the person carrying out the inspection or test and the user shall forthwith cease the use of the pressure equipment until such weakness or defect has been rectified to the satisfaction of the person who carried out the inspection and the approved inspection authority concerned in cases of modifications or repairs, as the case may be, or the steam generator, pressure vessel or storage vessel has been re-rated to the satisfaction of the approved inspection authority. | ||||
| Pressure Equipment Regulations 12(1) | 12 | (1) | entry | The user may, as an alternative to the in-service inspection and testing interval requirements referred to in regulation 11(1)(d), implement a risk-based inspection management system in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 12(2) | 12 | (2) | entry | A risk-based inspection process and implementation shall be verified by a certification body accredited by the accreditation authority in terms of ISO 17021 specifically for risk-based inspections and approved by the chief inspector. | ||||
| Pressure Equipment Regulations 13(1) | 13 | (1) | opening | Subject to the requirement of the relevant health and safety standard incorporated into these Regulations under section 44 of the Act— | ||||
| Pressure Equipment Regulations 13(1)(a) | 13 | (1) | (a) | entry | any person who intends to modify or repair any pressure equipment shall cause such modification or repair to be carried out in accordance with the relevant health and safety standard, and in accordance with the assessment procedure, as specified by the relevant hazard category as determined by SANS 347; | |||
| Pressure Equipment Regulations 13(1)(b) | 13 | (1) | (b) | entry | any modifier or repairer carrying out any modification or repair, referred to in paragraph (a), shall issue a certificate in which the extent of the modification or repair is described and certify that such work is in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act: | |||
| Pressure Equipment Regulations 13(1)(b) | 13 | (1) | (b) | proviso | Provided that such certificate shall be countersigned by the approved inspection authority, where applicable, as evidence that the design of such modification has been verified and that it has been modified or repaired and tested under its supervision in accordance with the original health and safety standard where reasonably practicable; | |||
| Pressure Equipment Regulations 13(1)(c) | 13 | (1) | (c) | entry | any user requiring re-certification of any pressure equipment shall ensure that the re-certification is performed under the supervision of an approved inspection authority, as applicable; and | |||
| Pressure Equipment Regulations 13(1)(d) | 13 | (1) | (d) | entry | whenever it appears from any inspection or test that pressure equipment cannot be used safely in accordance with its design criteria and the user chooses not to have the necessary repairs effected immediately, the user shall, subject to approval by an approved inspection authority, ensure that the pressure equipment is re-rated, the amended data plate added and the pressure equipment operated within the re-rated criteria: | |||
| Pressure Equipment Regulations 13(1)(d) | 13 | (1) | (d) | proviso | Provided that, in the case of a steam generator, the registration certificate, together with a copy of the approved inspection authority’s design verification report, shall be forwarded to the provincial director for updating of the steam generator registration. | |||
| Pressure Equipment Regulations 14(1) | 14 | (1) | entry | Every user of pressure equipment shall keep a record, which shall be open for inspection by an inspector, in which the certificate of manufacture, and the results, after manufacturing, of all inspections, tests, modifications and repairs shall be recorded. | ||||
| Pressure Equipment Regulations 14(2) | 14 | (2) | opening | When pressure equipment is sold, the manufacturer shall ensure that it is accompanied, where relevant, with instructions for the user, containing all the necessary safety information relating to— | ||||
| Pressure Equipment Regulations 14(2)(a) | 14 | (2) | (a) | entry | mounting, including the assembling of different pieces of pressure equipment; | |||
| Pressure Equipment Regulations 14(2)(b) | 14 | (2) | (b) | entry | putting into service; and | |||
| Pressure Equipment Regulations 14(2)(c) | 14 | (2) | (c) | entry | maintenance, including checks by the user: | |||
| Pressure Equipment Regulations 14(2) | 14 | (2) | proviso | Provided that those instructions shall cover information affixed to the pressure equipment in accordance with these Regulations and the relevant health and safety standard incorporated into these Regulations by section 44 of the Act, with the exception of serial identification, and be accompanied, where appropriate, by technical documents, drawings and diagrams that are necessary for a full understanding of the instructions: Provided further that, if appropriate, the instructions shall also refer to hazards arising from misuse of the pressure equipment. | ||||
| Pressure Equipment Regulations 14(3) | 14 | (3) | entry | The manufacturer shall keep the original manufacturing records of the pressure equipment for a minimum period of 12 years. | ||||
| Pressure Equipment Regulations 15 | 15 | entry | The user shall cause pressure equipment to be erected and maintained in such a manner that access to and exit from any chamber, flue, manhole, inspection opening, control or accessory is safe and unobstructed. | |||||
| Pressure Equipment Regulations 16(1) | 16 | (1) | opening | Any user of pressure equipment shall cause such pressure equipment which for operational purposes is equipped with a quick-actuating opening, to be provided with an interlock or other effective means for preventing— | ||||
| Pressure Equipment Regulations 16(1)(a) | 16 | (1) | (a) | entry | a rise of pressure inside the pressure equipment before the quick-actuating openings are in the fully closed and locked position; and | |||
| Pressure Equipment Regulations 16(1)(b) | 16 | (1) | (b) | entry | the release of the quick-actuating opening from the locked and closed position before the pressure inside the pressure equipment has been reduced to atmospheric pressure or the pressure across the openings has been equalised. | |||
| Pressure Equipment Regulations 17(1) | 17 | (1) | opening | No person shall— | ||||
| Pressure Equipment Regulations 17(1)(a) | 17 | (1) | (a) | entry | handle, store or distribute any gas in any manner, which includes the filling of a container, other than in accordance with the relevant health and safety standard incorporated into these Regulations under section 44 of the Act; | |||
| Pressure Equipment Regulations 17(1)(b) | 17 | (1) | (b) | entry | install or remove an appliance, pressure equipment or system for gas in any manner other than in accordance with the relevant safety standard incorporated into these Regulations under section 44 of the Act; | |||
| Pressure Equipment Regulations 17(1)(c) | 17 | (1) | (c) | entry | install or remove a gas appliance, or a gas system or a gas reticulation system, unless such person is an authorised person; or | |||
| Pressure Equipment Regulations 17(1)(d) | 17 | (1) | (d) | entry | use pressure equipment or systems for gas in any manner other than in accordance with the relevant safety standard incorporated into these Regulations under section 44 of the Act. | |||
| Pressure Equipment Regulations 17(2) | 17 | (2) | entry | After installation or re-installation, and before commissioning a gas system, the user shall ensure that an external inspection and a leak test are performed by an authorised person or an approved inspection authority as applicable in terms of subregulation (1) (c). | ||||
| Pressure Equipment Regulations 17(3) | 17 | (3) | entry | An authorised person or an approved inspection authority shall issue a certificate of conformity after completion of a gas installation, modification, alteration or change of user or ownership in the form of Annexure 1. | ||||
| Pressure Equipment Regulations 18(1) | 18 | (1) | entry | No user shall use, require or permit a transportable gas container to be used, and no user shall fill, place in service, handle, modify, repair, inspect or test any transportable gas container, other than in compliance with the relevant standards incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 18(2) | 18 | (2) | entry | The inspection and test referred to in subregulation (1) shall be carried out by an approved testing station. | ||||
| Pressure Equipment Regulations 18(3) | 18 | (3) | entry | Applications for approval of a testing station shall include proof of accreditation as prescribed in subregulation (4), and shall include full contact details and address information. | ||||
| Pressure Equipment Regulations 18(4) | 18 | (4) | entry | The chief inspector’s approval is subject to a valid accreditation certificate issued by the accreditation authority: | ||||
| Pressure Equipment Regulations 18(4) | 18 | (4) | proviso | Provided that the chief inspector may set additional requirements before granting approval. | ||||
| Pressure Equipment Regulations 19(1) | 19 | (1) | entry | No user shall use, require or permit the use of a fire extinguisher unless designed, constructed, filled, recharged, reconditioned, modified, repaired, inspected or tested in accordance with the relevant safety standard incorporated into these Regulations under section 44 of the Act. | ||||
| Pressure Equipment Regulations 19(2) | 19 | (2) | entry | No person shall fill, recharge, recondition, modify, repair, inspect or test any fire extinguisher unless such person is an authorised person employed by a permit holder: | ||||
| Pressure Equipment Regulations 19(2) | 19 | (2) | proviso | Provided that a permit is issued by an organisation approved by the chief inspector. | ||||
| Pressure Equipment Regulations 19(3) | 19 | (3) | entry | Applications for approval shall include proof of accreditation as prescribed in subregulation (4), and shall include full contact details and address information. | ||||
| Pressure Equipment Regulations 19(4) | 19 | (4) | entry | The chief inspector’s approval shall be subject to a valid accreditation certificate issued by the accreditation authority: | ||||
| Pressure Equipment Regulations 19(4) | 19 | (4) | proviso | Provided that the chief inspector may set additional requirements before granting approval. | ||||
| Pressure Equipment Regulations 20(1) | 20 | (1) | entry | Any person who contravenes or fails to comply with any of the provisions of regulations 3, 4, 5, 6, 7 (1), 7 (2), 8 (1), 8 (2), 8 (3), 8 (4), 8 (5), 8 (7), 9, 10, 11 (1), 11 (3), 12 (2), 13, 14, 15, 16, 17, 18 (1), 18 (2), 19 (1) and 19 (2) shall be guilty of an offence and liable upon conviction to a fine or to imprisonment for a period not exceeding 12 months and, in the case of a continuous offence, to an additional fine of R200,00 for each day on which the offence continues or additional imprisonment of one day for each day on which the offence continues: | ||||
| Pressure Equipment Regulations 20(1) | 20 | (1) | proviso | Provided that the period of such additional imprisonment shall not exceed 90 days. | ||||
| Pressure Equipment Regulations 21 | 21 | entry | The Vessels under Pressure Regulation, 1996, published under Government Notice No. R.1591, dated 4 October 1996, is hereby repealed. | |||||
| Pressure Equipment Regulations 22 | 22 | entry | These Regulations shall be called the Pressure Equipment Regulations, 2009, and shall come into effect on 1 October 2009: | |||||
| Pressure Equipment Regulations 22 | 22 | proviso | Provided that approved inspection authority for in-service inspections shall come into effect on 1 April 2011 on condition that the inspection shall be carried out by an authorised person. |