Pressure Equipment Regulations, 2009 › 11 Inspection and test
Pressure Equipment Regulations 11(1)(c)
| ID | 1947 |
|---|---|
| Citation | Pressure Equipment Regulations 11(1)(c) |
| Instrument | Pressure Equipment Regulations, 2009 |
| Instrument type | Regulation |
| Part | — |
| Number | 11 |
| Heading | Inspection and test |
| Subsection | (1) |
| Paragraph | (c) |
| Subparagraph | — |
| Item | — |
| Text role | entry |
| Sort key | 12.0011.00070 |
| Source | GNR.734 of 15 July 2009 |
| Amended by | — |
| In force from | 2009-10-01 |
| Status | In force |
| Verified | No |
| Flag | — |
| Note | — |
| Text | every fire-tube steam generator to be subjected to an external inspection every 12 months and a witnessed hydraulic test and crack detection of critical welds every 36 months, by an approved inspection authority for in-service inspection appointed by the user in writing; |
Sign in to edit or flag this row.